Call Us Now Enquire Now
Loading...

HOMES BY CHAITANYA – Distinct by design

GITANJALI

STYLISED RESIDENCES ON HARRINGTON ROAD

Where luxury meets lifestyle

Experience a home built for quality and comfort at Gitanjali, where every detail is curated with you in mind. Spacious 4 BHK with a study room and staff room with a separate entry; we’ve ensured that each space offers the highest standard of living.

S + 3

Floors

4

Bhk

5

Units

3,000 Sq ft

Size Range

Planning Permit No PPA/WDCN09/09146/2024 dated 28.10.2024
Building Permit No BA/WDCN09/07439/2024 dated 28.10.2024
TNRERA No NA (Not applicable)

Amenities

parking

Two covered car parks

rain WATER HARVESTING

Rainwater harvesting

smart-door

Access controlled lobby doors

cctv

CCTV surveillance

intercom

Colour video door phone & intercom

SECURITY CABIN

Security cabin

lift (1)

Lifts with V3F & ARD

toilets

Toilets for drivers & Staff

EV charger

EV charging points

Specifications

Structure

• Seismic zone III compliant RCC frame structure.
• Solid concrete block masonry.

Flooring and Tiles

  • Foyer; Living; Dining.
    – Imported marble with coordinated skirting.
  • Bedrooms
    – 2’*2’ Vitrified tiles with coordinated skirting.
  • Kitchen
    – 2’*2’ Vitrified tiles with coordinated skirting
    – 1’*2’ backsplash glazed tile up to 2’ above counter.
  • Balcony
    – 2’*2’ Vitrified tiles with coordinated skirting.
  • Utility
    – 1’*2’ Vitrified non-skid tiles with suitable dado 1’*2” in wet area up to 3’ height.
  • Toilet
    – 1’*2’ Vitrified non-skid tiles with suitable dado up to 7’6” height.
  • Terrace Decks
    – All-weather proof tiles.

Kitchen and Utility

  • Polished black granite platform with double nose edge at ergonomic 32” from the floor, over RCC counter supported by suitable brickwork.
  • Stainless steel single bowl sink and draining board in kitchen and utility of Nirali or equivalent make.
  •  Provision for exhaust.

Doors, windows and Railings

  • Main Door
    – 7’6” *3’6” Height –Teak wood door shutter along with suitable frame.
  • Internal Doors
    – 7’6” Height – Factory finished 32 mm thick Veneer door shutter along with suitable frame. Yale or equivalent brand locks with Stainless Steel fittings.
  • Windows
    – UPVC window frames and profiles. Sliding with Saint- Gobain glass or equivalent.
  • French Doors
    – UPVC profiles with Saint-Gobain glass or equivalent.
  • Grills
    – MS Grills fixed on to the walls. Zinc Chromate Anti corrosive primer with Enamel Paint.

Sanitaryware and plumbing

  • Sanitary ware
    – Kohler/Roca or equivalent.
  • C.P. Fittings
    – Roca/Kohler or equivalent.

     

Surface Finishes

  • Internal walls Finished with Asian putty, one coat of primer, two coats of Asian paint.
  • Internal ceilings Finished with Asian putty, emulsion (Asian Paints) roller finish.
  • Exterior walls Weatherproof exterior emulsion.

Electrical Distribution and Wiring

  • TV, telephone and modem points in all bedrooms and living room.
  • Electrical distribution & concealed wiring suitable for 3-phase power supply.
  • Fire-resistant electrical wires of Finolex or Anchor make.
  • Switches and sockets of Scheneider/Legrand or equivalent make.
  • Air-conditioning points in all rooms.
  • One MCB for each room in the main distribution box in each residence.
  • Three phase power supply.

All products like switches and accessories, PVC conduits, switchgear, wiring cable etc. are compliant with IS code of Practice for electrical wiring.

Common areas

  • Ground floor lobby
    – Polished granite combination design flooring with matched skirting.
  • Upper Floor Lobbies
    – Polished granite slab with matched skirting.
  • Staircases
    – Granite flooring with skirting

External areas

  • Pavement
    – Paving with granolithic flooring/concrete interlock pavers.
    – Drains along the compound wall to divert rain water to rain harvesting pit.
  • Landscaping
    – As per the Architect’s detailing.
  • Elevator
    – One 8 passengers capacity elevator of Johnson or equivalent make.
  • Generator
    – Generator of the required rating to cater lights, fan point in all rooms, Calling bell, Fridge point, Three AC in each apartment and for adequate lighting in the common area and to operate motor pump and elevator.
  • Security
    – Access control lobby doors.
    – CCTV cameras in common areas.
    – Video door bell.

More utilities on Campus

  • Rainwater harvesting system.
  • OH tank with float switch.
  • Pressure pump.
  • Toilets for drivers/servants.

  • EV charging points in the Stilt floor.

(While all reasonable care has been taken in providing the information, thespecifications mentioned are subject to change, as may be required by the Developer an d Architect, whose decision will be final. Any change in specifications would be equivalent to or of a higher standard.)

Construction status

As of April 2025

Stage of Construction Status
Foundation  
FLOOR
Roof Slab
STILT 1st 2nd 3rd 4th 5th
           
Block Work            
Plastering            
Flooring            
Painting            
Common Area Works  
External Finish Works  
Ready for Handover  
Search

May 2025

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31

June 2025

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
0 Adults
0 Children
Pets
Size
Price
Search

May 2025

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
0 Guests

Compare listings

Compare

Compare experiences

Compare