Call Us Now Enquire Now

BRINDAVAn

Your Peaceful Retreat in ANNA AVENUE, ADYAR

Quiet Sanctuary. Nature’s Embrace. Endless Calm.

Nestled in a quiet locale yet close to modern amenities, Calm & Avenue offers a peaceful home without compromising on convenience. Live, work, and unwind effortlessly in this ideal residence.

5

Floors

3 BHK

Bedrooms

15 Units

No. of Units

1770 - 2517 Sq ft

Size Range

Planning Permit No OL-PP/NHRB/0445/2024, DATED 22.07.2024
Building Permit No CEBA/WDCN13/00377/2024, DATED 22.07.2024
TNRERA No TN/29/Building/0508/2024, DATED 22.10.2024

Amenities

parking

Two covered car parks

rain WATER HARVESTING

Rainwater harvesting

smart-door

Access controlled lobby doors

cctv

CCTV surveillance

intercom

Colour video door phone & intercom

SECURITY CABIN

Security cabin

lift (1)

Lifts with V3F & ARD

toilets

Toilets for drivers & Staff

EV charger

EV charging points

Specifications

Structure

• Seismic zone III compliant RCC frame structure.
• Solid concrete block masonry.
• Stone cladding on sections of external wall faces based on elevation.
• Pile Foundation.

Flooring and Tiles

  • Foyer; Living; Dining.
    – Kajaria 4’*6’ Vitrified tiles with coordinated skirting for the remaining Apartments.
  • Bedrooms
    – Kajaria 2’*4’ Vitrified tiles with coordinated skirting
  • Kitchen
    – Kajaria 2’*4’ Vitrified tiles with coordinated skirting.
    – Kajaria 1’*2’ backsplash glazed tile up to 2’ above counter.
  • Balcony
    – Kajaria 2’*2’ Vitrified tiles with coordinated skirting.
  • Utility
    – Kajaria 1’*2’ Vitrified non-skid tiles with suitable dado 1’*2” in wet area up to 3’ height.
  • Toilet
    – Kajaria 2’*4’ Vitrified non-skid tiles with suitable dado
    up to ceiling height. Niche in the wall in shower area.
  • Terrace Decks
    – All-weather proof tiles.

Kitchen and Utility

  • Polished black granite platform with double nose edge at ergonomic 32” from the floor, over RCC counter supported by suitable brickwork.
  •  Matt finish Stainless steel single bowl sink with drain board of Nirali make for utility and single/double bowl without drain of Kaff/Hafele/Carysil for Kitchen.
  •  Provision for exhaust in Kitchen and Utility.

Doors, windows and Railings

  • Main Door
    – 7’6” Height –Solid Timber Teak wood door shutter along with suitable frame.
    Doors Melamine polished finish. Yale brand lock with Stainless Steel fittings.
  • Internal Doors
    – 7’6” Height – Factory finished 32mm thick Veneer door shutter along with suitable frame. Yale brand Locks with Stainless Steel fittings. For Toilet Doors – One side Veneer and other side – Painted or laminated.
  • Windows
    – Fenesta UPVC sliding, clear glass frames & bug screens with Saint Gobain Glass.
  • French Doors
    – Fenesta UPVC/ equivalent sliding, clear glass frames with Saint-Gobain glass.
  • Grills
    – MS Grills fixed on to the walls. Zinc Chromate Anti corrosive primer with Enamel Paint.

Sanitaryware and plumbing

  • Sanitary ware
    – Kohler/Grohe/Roca EWC wall mounted with concealed tank, above Counter wash basin with granite top in all Bedroom Toilets, Dining room & Powder room. Ledge wall in bathrooms. All toilet door jams to be in granite
  • C.P. Fittings
    – Kohler/Grohe/Roca.

  • Plumbing

    – Single lever hot and cold-water mixer unit for high pressure showers.

    – Concealed master-controlled stop cock in each restroom on the inside for easy
    maintenance.

    – Provision for Geyser in all the toilets. Hot water connection in all wash basins.

    – Hot water connections in the Kitchen.

Surface Finishes

  • Internal walls Finished with Asian putty, one coat of primer, two coats of Asian paint.
  • Internal ceilings Finished with Asian putty, emulsion (Asian Paints) roller finish.
  • Exterior walls Weatherproof exterior emulsion.

Electrical Distribution and Wiring

  • TV, telephone and modem points in all bedrooms and living room.
  • Electrical distribution & concealed wiring suitable for 3-phase power supply.
  • Fire-resistant electrical wires of Finolex or Anchor make.
  • Switches and sockets of Scheneider/Legrand or equivalent make.
  • Air-conditioning points in all rooms.
  • One MCB for each room in the main distribution box in each residence.
  • Three phase power supply.
  • All products like switches and accessories, PVC conduits, switchgear, wiring cable etc. are compliant with IS code of Practice for electrical wiring.

Common areas

  • Ground floor lobby
    – Polished granite combination design flooring with matched skirting.
  • Upper Floor Lobbies
    – Polished granite slab with matched skirting.
    – Stone cladding around elevator.
  • Staircases
    – Granite flooring with skirting
    – Handrails with MS grill work

External areas

  • Pavement
    – Paving with granolithic flooring/concrete interlock pavers.
    – Brick kerbs and drains along the compound wall to divert rainwater to rain
    harvesting pit.
  • Landscaping
    – Landscaped garden with seating.
    – Greenery along compound wall, and on terrace.
  • Elevator
    – One 8 passenger capacity elevator of Johnson which
    goes up to the terrace.
  • Generator
    – Generator with sound proof covering of the required rating to cater lights, fan points modem points in all rooms. Calling bell, Fridge point and all 5 amp points, 3 AC in each apartment and for adequate lighting in the common area and to operate motor pump and elevator
  • Security
    – Access control lobby doors.
    – CCTV cameras in common areas – On all 4 sides in the ground floor, Parking, all floor lobbies and terrace landing.
    – Video door bell at lift lobby entrance and individual flat entrance, with approval option from mobile phone.

More utilities on Campus

  • Rainwater harvesting system.
  • OH tank with float switch.
  • Pressure pump.
  •  Toilet for drivers/staff in stilt floor and for residents in the terrace.
  • Solar cells as per CMDA norms.
  • Electrical & high-pressure water points in car park area.
  • Electric vehicle charging station.
  • Termite proofing/ pest control.
  • Automatic water motors.

(While all reasonable care has been taken in providing the information, the
specifications mentioned are subject to change, as may be required by the Developer and Architect, whose decision will be final. Any change in specifications would be equivalent to or of a higher standard.)

Construction status

As of December 2024

Stage of Construction Status
Foundation  
FLOOR
Roof Slab
STILT 1st 2nd 3rd 4th 5th
           
Block Work            
Plastering            
Flooring            
Painting            
Common Area Works  
External Finish Works  
Ready for Handover  
Search

December 2024

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31

January 2025

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
0 Adults
0 Children
Pets
Size
Price
Search

December 2024

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
0 Guests

Compare listings

Compare

Compare experiences

Compare