Call Us Now Enquire Now
Loading...

HOMES BY CHAITANYA – Distinct by design

Kailash

STYLISED RESIDENCES ON KARPAGAM GARDEN

Effortless elegance, built to last.

These residences blend the enduring strength of quality construction with a soft, welcoming aesthetic. With seamless interiors, refined fittings, and a location tucked into one of the city’s most peaceful neighborhoods, Kailash offers a lifestyle that feels both grounded and elevated.

S + 4

Floors

3

Bhk

4

Units

2,675 Sq ft

Size Range

Planning Permit No OL-PP/NHRB/0082/2025 dated 11.03.2025
Building Permit No CEBA/WDCN13/00129/2025 dated 24.03.2025
TNRERA No NA (Not applicable)

Amenities

parking

Two covered car parks

rain WATER HARVESTING

Rainwater harvesting

smart-door

Access controlled lobby doors

cctv

CCTV surveillance

intercom

Colour video door phone & intercom

SECURITY CABIN

Security cabin

lift (1)

Lifts with V3F & ARD

toilets

Toilets for drivers & Staff

EV charger

EV charging points

Specifications

Structure

Seismic zone III compliant RCC frame structure.

Solid concrete block masonry.

Stone cladding on sections of external wall faces.

Flooring and Tiles

  • Foyer; Living; Dining.
    – 4’*2’ Vitrified tiles with coordinated skirting.
  • Bedrooms
    – 2’*2’ Vitrified tiles with coordinated skirting.
  • Kitchen
    – 2’*2’ Vitrified tiles with coordinated skirting
    – 1’*2’ backsplash glazed tile up to 2’ above counter.
  • Balcony
    – 2’*2’ Vitrified tiles with coordinated skirting.
  • Utility
    – 2’*2’ Vitrified non-skid tiles with suitable dado 1’*2” in wet area up to 3’ height.
  • Toilet
    – 1’*2’ Vitrified non-skid tiles with suitable dado up to 7’6” height.
  • Terrace Decks
    – All-weather proof tiles.

Kitchen and Utility

  • Polished black granite platform with double nose edge at ergonomic 32” from the floor, over RCC counter supported by suitable brickwork.
  • Stainless steel single bowl sink and draining board in kitchen and utility of Nirali or equivalent make.

  •  Provision for exhaust.

Doors, windows and Railings

  • Main Door
    – 7’6” Height –Solid Timber Teak wood door shutter along with suitable frame.

    – Doors Melamine polished finish. Yale or equivalent brand lock with Stainless Steel fittings.

  • Internal Doors
    – 7’6” Height – Factory finished 32mm thick Veneer door shutter along with suitable frame. Yale or equivalent brand Locks with Stainless Steel fittings. For Toilet Doors – One side Veneer and other side – Painted or laminated
  • Windows
    – UPVC/ equivalent sliding, clear glass frames & bug screens with Saint- Gobain

    glass or equivalent.

  • French Doors
    – UPVC/ equivalent sliding, clear glass frames with Saint-Gobain glass or
  • Grills
    – MS Grills fixed on to the walls. Zinc Chromate Anti corrosive primer with Enamel Paint.

Sanitaryware and plumbing

  • Sanitary ware
    – Kohler/Roca or equivalent. EWC wall mounted with concealed tank, under Counter wash basin in all Bedroom Toilets & Powder room.
  • C.P. Fittings
    – Kohler/ Roca or equivalent.
  • Plumbing

    Single lever hot and cold-water mixer unit for high pressure showers.

    Concealed master-controlled stop cock in each restroom on the inside for easy maintenance.

    Provision for Geyser in all the toilets.

    Hot water connection in all wash basins.

    Hot water connections in the Kitchen.

 

Surface Finishes

  • Internal walls

    – Finished with Asian putty, one coat of primer, two coats of Asian paint emulsion with roller finish.

  • Internal ceilings
    – Finished with Asian putty, emulsion (Asian Paints) roller finish.
  • Exterior walls
    – Weatherproof exterior emulsion.

Electrical Distribution and Wiring

  • TV, telephone and modem points in all bedrooms and living room.
  • Electrical distribution & concealed wiring suitable for 3-phase power supply.
  • Fire-resistant electrical wires of Finolex or Anchor make.
  • Switches and sockets of Scheneider/Legrand or equivalent make.
  • Air-conditioning points in all rooms.
  • One MCB for each room in the main distribution box in each residence.
  • Three phase power supply.

All products like switches and accessories, PVC conduits, switchgear, wiring cable etc. are compliant with IS code of Practice for electrical wiring.

Common areas

  • Ground floor lobby
    – Polished granite combination design flooring with matched skirting.
  • Upper Floor Lobbies
    – Polished granite slab with matched skirting                                                                                                                                       – Polished granite slab with matched skirting
  • Staircases
    – Granite flooring with skirting                                                                                                                                                              – 3Handrails with MS grill work

External areas

  • Pavement
    – Paving with granolithic flooring/concrete interlock pavers.
    – Drains along the compound wall to divert rain water to rain harvesting pit.
  • Landscaping
    – Brick kerbs and drains along the compound wall to divert rain water to rain harvesting pit.                                                          – Greenery along compound wall, and on terrace.       
  • Elevator
    – One 6 passengers capacity elevator of Johnson or equivalent make.
  • Generator
    – 100% power backup with generator of suitable rating to support all electrical requirement

    including air-conditioning.

  • Security
    – Access control lobby doors.
    – CCTV cameras in common areas.
    – Video door bell.

More utilities on Campus

  • Rain water harvesting system.
  • OH tank with float switch.
  • Pressure pump.
  • Toilet for drivers/staff.
  • Solar cells as per CMDA norms.
  • Electrical & high pressure water points in car park area.
  • Electric vehicle charging station.

(While all reasonable care has been taken in providing the information, thespecifications mentioned are subject to change, as may be required by the Developer an d Architect, whose decision will be final. Any change in specifications would be equivalent to or of a higher standard.)

Construction status

As of April 2025

Stage of Construction Status
Foundation  
FLOOR
Roof Slab
STILT 1st 2nd 3rd 4th 5th
           
Block Work            
Plastering            
Flooring            
Painting            
Common Area Works  
External Finish Works  
Ready for Handover  
Search

May 2025

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31

June 2025

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
0 Adults
0 Children
Pets
Size
Price
Search

May 2025

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
0 Guests

Compare listings

Compare

Compare experiences

Compare