Call Us Now Enquire Now

Lakshmi Kripa

PREMIUM, PICTURESQUE APARTMENTS IN KASTURBA NAGAR

A harmonious co-existence with nature

Come home to verdant splendour and to the gentle rustle of foliage on the boughs of mature trees. These serene and peaceful residences, located in a leafy, canopy-covered neighbourhood are also just a wafting breeze away from everywhere that matters.

S + 5

Floors

3 BHK

Bedrooms

5 Units

No. of Units

2,000 Sq ft

Size Range

Planning Permit No OL-PP/NHRB/0036/2023 dated 24.01.2023
Building Permit No CEBA/WDCN13/00053/2023 dated 15.02.2023

Amenities

rain WATER HARVESTING

Rainwater harvesting

cctv

CCTV surveillance

smart-door

Access controlled lobby doors

toilets

Toilets for drivers & Staff

lift (1)

Lifts with V3F & ARD

EV charger

EV charging points

SECURITY CABIN

Security cabin

POWER BACKUP

Power back up

intercom

Colour video door phone & intercom

Specifications

Structure

  • Seismic zone III compliant RCC frame structure
  • Solid concrete block masonry

Flooring

  • Foyer; living; dining
    – 2’*2’ vitrified tiles with coordinated skirting.
  • Bedrooms
    – 2’*2’ vitrified tiles with coordinated skirting.
  • Kitchen
    – 2’*2’ vitrified tiles with coordinated skirting.
    – 1’*2’ backsplash glazed tile up to 2’ above counter.
  • Balcony
    – 2’*2’ vitrified tiles with coordinated skirting.
  • Utility
    1’*2’ non-skid tiles with suitable dado 1’*2” in wet area up to 3’ height.
  • Toilets
    – 1’*2’ Ceramic non-skid tiles with suitable dado up to 7’6” height.
  • Terrace decks
    All-weather proof tiles.

Kitchen and Utility

  • Polished black granite platform with double nose edge at ergonomic 32” from the floor, over RCC counter supported by suitable brickwork
  • Stainless steel single bowl sink and draining board in kitchen nirali or equivalent make
  • Provision for exhaust

Doors, Windows and Railing

  • Main Door:
    7’6”*3’6”Height – teak wood door shutter along with suitable frame
  • Internal Door
    7’6” Height – factory finished 32 mm thick veneer door shutter along with suitable frame. yale or equivalent brand locks with stainless steel fittings. for toilet doors – one side veneer and other side is painted and laminated
  • Windows
    Fenesta/Equivalent UPVC window frames and profiles. sliding with Saint- Gobain glass or equivalent
  • French Door
    Fenesta/Equivalent UPVC profiles with Saint-Gobain glass or equivalent
  • Grills
    MS Grills fixed on to the walls. zinc chromate anti corrosive primer with enamel paint

Painting

  • Internal Walls Finished with Asian putty, one coat of primer, two coats of Asian paint with roller finish
  • Internal ceilings Finished with Asian putty, emulsion Asian paint with roller finish
  • Exterior walls Weather proof exterior emulsion

Sanitaryware and Plumbing

  • Sanitary ware
    Kohler/Vitra or equivalent
  • C.P. Fittings
    Kohler/Vitra or equivalent

Electrical

  • TV, telephone and modem points in all bedrooms and living room
  • Electrical distribution & concealed wiring suitable for 3-phase power supply
  • Fire-resistant electrical wires of Finolex or Anchor make
  • Switches and sockets of Schneider/Legrand or equivalent make
  • Air-conditioning points in all rooms
  • One MCB for each room in the main distribution box in each residence
  • Three phase power supply
All products like switches and accessories PVC conduits, switchgear, wiring cable etc. are compliant with IS code of practice for electrical wiring

Common Areas

  • Ground floor lobby
    Polished granite combination design flooring with matched skirting
  • Upper floor lobbies
    Polished granite slab with matched skirting
  • Staircases
    Granite flooring with skirting handrails with MS grill work
  • External areas
    Paving with granolithic flooring/concrete interlock pavers. Drains along the compound wall to divert rain water to rain harvesting pit
  • Landscaping
    As per the Architect’s detailing
  • Elevator
    One 8 passengers capacity elevator of Johnson or equivalent make
  • Generator
    Generator of the required rating to cater lights, fan point in all rooms, calling bell, fridge point, one AC in each apartment and for adequate lighting in the common area and to operate motor pump and elevator

Security

  • Access control doors
  • CCTV cameras in common areas
  • Video doorbell

More Utilities

  • Rain water harvesting system
  • OH tank with float switch
  • Pressure pump
  • Toilets for drivers/servants

Construction status

As of September 2024

Stage of Construction Status
Foundation
FLOOR
Roof Slab
STILT 1st 2nd 3rd 4th 5th
Block Work  
Plastering  
Flooring    
Painting            
Common Area Works  
External Finish Works  
Ready for Handover  
Search

October 2024

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31

November 2024

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
0 Adults
0 Children
Pets
Size
Price
Search

October 2024

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
0 Guests

Compare listings

Compare

Compare experiences

Compare