Call Us Now Enquire Now

CHINAR

STYLISED APARTMENTS IN BESANT NAGAR

A very generous interpretation of luxury

Generously sized, one apartment per floor with 4 sides open to ventilation. Well connected to schools, hospitals, beach and Theosophical society. With Chaitanya, you are assured of design excellence, our usual obsessive attention to detail, elegant elevations, unparalleled construction standards, best-of-class fixtures, fittings and surfaces.

S + 3

Floors

3 BHK

Bedrooms

3 Units

No. of Units

2,100 Sq ft

Size Range

Planning Permit No PPA/WDCN13/10639/2023 dated 02.01.2024
Building Permit No BA/WDCN13/08392/2023 dated 02.01.2024
TNRERA No NA

Amenities

parking

Two covered car parks

rain WATER HARVESTING

Rainwater harvesting

smart-door

Access controlled lobby doors

cctv

CCTV surveillance

intercom

Colour video door phone & intercom

SECURITY CABIN

Security cabin

lift (1)

Lifts with V3F & ARD

toilets

Toilets for drivers & Staff

EV charger

EV charging points

Specifications

Structure

  • Seismic zone III compliant RCC frame structure.
  • Solid concrete block masonry.
  • Stone cladding on sections of external wall faces.

Flooring and Tiles

  • Living; Dining – 2’ x 4’ Vitrified tiles with matched skirting.
  • Bedrooms – 2’ x 2’ Vitrified tiles with matched skirting.
  • Kitchen – 2’ x 2’ Vitrified tiles with coordinated skirting.
    – 1’ x 2’ backsplash glazed tile up to 2’ above counter
  • Balcony – 2’ x 2’ Vitrified tiles with coordinated skirting.
  • Utility – 1’ x 2’ Vitrified non-skid tiles with suitable dado up to a height of 3’3”.
  • Toilet – 1’ x 2’ Vitrified non-skid tiles with suitable dado up to a height of 7’.
  • Terrace – All-weather proof tiles.

Kitchen and Utility

  • Polished black granite platform with double nose edge at ergonomic 32” from the floor, over RCC counter supported by suitable brickwork.
  • Stainless steel single bowl sink and draining board in kitchen of Nirali or equivalent make.
  • Provision for exhaust.

Doors, windows and Railings

  • Main Door – For Landowners Apartments, doors to be designed by the Architect as required with a suitable frame. Yale or equivalent brand lock with Stainless Steel fittings.
  • For all other apartments: – 7’ Height –Factory finished teak wood shutters with a suitable frame. Yale or equivalent brand lock with Stainless Steel fittings.
  • Internal Doors – 7’ Height – Skin paneled doors with teak wood frames. Yale or equivalent brand Locks with Stainless Steel fittings.
  • Toilet Doors – 7’ Height – Skin paneled doors with teak wood frames.
  • Windows – UPVC windows with clear glass frames of Saint- Gobain glass or equivalent.
  • French Doors – UPVC/ equivalent sliding, clear glass frames of Saint- Gobain glass or equivalent.
  • Grills – MS Grills fixed on to the walls. Zinc Chromate Anti corrosive primer with Enamel Paint.

Sanitaryware and plumbing

  • Sanitary ware
    – Kohler / Roca or equivalent. EWC wall mounted with concealed tank, below counter wash basin in Master Bedroom Toilet & Dining.
    – Ordinary Wall mounted rectangular wash basin in Other Bedroom Toilets.
  • C.P. Fittings
    – Kohler / Roca or equivalent. C.P. Pillar tap, Diverter, Overhead shower arm with rose, Health faucet, angle cock – (for wash basin and EWC) with connections, C.P. bottle trap for wash basin.
  • Plumbing
    – All internal concealed piping with CPVC pipes. All other open water lines threadable PVC with R brand specials / equivalent. Wastewater lines with PVC Finolex /True bore/ equivalent 6 Kg. class. All rainwater pipes with PVC Finolex /Truebore/equal 4Kg. class.
    – All pipes painted with two coats of enamel paint.
    – Separate Motor for Metro water Sump and Bore well.
    – Provision for Geyser in all the toilets.

Surface Finishes

  • Internal walls Finished with Birla putty, one coat of primer, two coats of Asian paint.
  • Internal ceilings Finished with Birla putty, emulsion (Asian Paints) roller finish.
  • Exterior walls Weatherproof exterior emulsion..

Electrical Distribution and Wiring

  • TV, telephone and modem points in all bedrooms and living room.
  • Electrical distribution & concealed wiring suitable for 3-phase power supply.
  • Fire-resistant electrical wires of Finolex or Anchor make.
  • Switches and sockets of Scheneider/Legrand or equivalent make.
  • Air-conditioning points in all rooms..
  • One MCB for each room in the main distribution box in each residence.
  • Three phase power supply.
  • All products like switches and accessories PVC conduits, switchgear, wiring cable etc. are compliant with IS code of Practice for electrical wiring.

Common areas

  • Ground floor lobby
    – Polished granite combination design flooring with matched skirting.
  • Upper Floor Lobbies
    – Polished granite slab with matched skirting.
  • Staircases
    – Granite flooring with skirting
    – Handrails with MS grill work

External areas

  • Pavement
    – Paving with granolithic flooring/concrete interlock pavers.
    – Brick kerbs and drains along the compound wall to divert rainwater to rain harvesting pit.
  • Landscaping
    – Greenery along compound wall and on terrace with seating.
  • Elevator
    – One 6 passengers elevator of Johnson or equivalent make.
  • Generator
    – Generator of the required rating to cater lights, fan point in all rooms, Calling bell, Fridge point, 3 AC in each apartment and for adequate lighting in the common area and to operate motor pump and elevator.
  • Security
    – Access control lobby doors.
    – CCTV cameras in common areas.
    – Video doorbell.

More utilities on Campus

  • Rainwater harvesting system.
  • OH tank with float switch.
  • Pressure pump.
  • Toilet for drivers/servants.
  • Solar cells as per CMDA norms.
  • EV Charging points.
(While all reasonable care has been taken in providing the information, the specifications mentioned are subject to change, as may be required by the Developer and Architect, whose decision will be final. Any change in specifications would be equivalent to or of a higher standard.)

Construction status

As of December 2024

Stage of Construction Status
Foundation
FLOOR
Roof Slab
STILT 1st 2nd 3rd
Block Work  
Plastering  
Flooring        
Painting        
Common Area Works        
External Finish Works        
Ready for Handover        
Search

December 2024

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31

January 2025

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
0 Adults
0 Children
Pets
Size
Price
Search

December 2024

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
0 Guests

Compare listings

Compare

Compare experiences

Compare